Work info:

Client: Telenor Serbia
Territory: Serbia
Services engaged: Concept, production, installation
Materials used: Corian, wood veneer, chipboard, MDF, metal, plexiglass, LED

DESCRIPTION:

Parallel to the first series of shops we also did first Telenor kiosk in same yet different design. No time for test elements or else. We had to go directly to the end product from the 3D and heavy utility requirements (we took complete project with civil works as well). Our subcontractors were producing elements in not only different workhouses, but also different countries 1000 km away from each other. And only time parts met was day before installing them. We installed it all overnight in just 5 hours time (basic civil work pre done, base completed and floor laid down). Not a scratch on the just installed wooden floor.